Grosvenor - Project Director
In my role as client Exec Project Manager I managed delivery of South Molton Triangle, which is divided into five sub-projects. The largest is the office led North and South block which is a JV. I oversaw design and procurement and left the project in early 2024 with McGee having just commenced works via a two-year Demolition and Enabling Contract.
2020 - 2023
Mayfair, 150,000 sqft Office, 30 retail units, residential
Public realm improvements
Grosvenor and part JV: Grosvenor / Mitsui Fudosan
Grosvenor - Project Director
As client Exec Project Manager I formed a design team and directed the project through RIBA Stage 1 and 2 design.
2020
Mayfair, Placemaking (reimagining Grosvenor Square)
Grosvenor
Grosvenor - SPM
I was client Exec Project Manager and joined the project in the early stages of construction. I saw it through site challenges and coordinated handover to Adidas and JV Asset Managers.
2018 - 2019
Mayfair, 40,000 sqft retail flagship store
JV: Grosvenor / Stow
Grosvenor - SPM
I worked as client Exec Project Manager to oversee Stage 2 design onwards which included planning, procurement and contract negotiation. Once in contract, I left the project.
2018 - 2020
Belgravia, 24,000 sqft retail, 9 residential units
Grosvenor
Grosvenor - PM
My role was client Project Manager and I was involved from final tender negotiation through to PC, again coordinating handover to Asset Managers and assisted with leasing queries and fit-out.
2017 - 2018
Mayfair, 14,000 sqft office, retail, courtyard
Grosvenor
Grosvenor - PM
I was client Project Manager, involved from inception of idea and initial brief through planning, design, construction to PC and beyond. I oversaw all PM functions, coordinated handover to Asset Managers and assisted with leasing queries and fit-out.
2015 - 2017
Belgravia, 80,000 sqft office, retail, courtyard
Grosvenor
Arup - SPM (seconded into Grosvenor - PM)
Acting as client Project Manager, I joined with 6 months to PC and ensured a smooth handover from Sir Robert McAlpine to Grosvenor.
2015
Mayfair, 12,000 sqft Office, 3 residential units
Grosvenor
Arup - PM
As a consultant Project Manager I oversaw the re-design and costing of a complex re-work of c.60 labs, value c.£15m.
2014
Kings Cross, 120 labs, 980,000 sqft
£450m construction
Sir Robert McAlpine - Senior Engineer
Senior Site Engineer & Package Manager. I joined as demolition was completing and left the project close to topping out.
2013
City of London, 170,000 sqft Office, 16 floors
£50m construction
Stanhope & Mitsui Fudosan
Sir Robert McAlpine - Senior Engineer
Package Manager & Section Manager. I joined when B3 raft slab was being poured and spent two years taking it to PC.
2010 - 2012
West End, 180,000 sqft Office, 54,000 sqft Retail
£165m construction
Sir Robert McAlpine - Engineer
I was a graduate Site Engineer & Package Manager and joined the project when steel frame was at level 3. I saw it through to PC.
2008 - 2010
City of London, 270,000 sqft Office, 13 floors
£87m construction
Exemplar & Canary Wharf Developments